W勴 (Ji Ji Da Qiao)
In General:
This is a PC cable stayed bridge under construction near the
epicenter. The structure consists of three parts, a central part
sustained by cable tendons from an RC pylon and continuous girders
at both sides. The central part was originally connected to the
side girders by PC tendons, but the tendons were broken and both
side-girders dropped from the shoes at the connected parts. The
top of the support piers located at both ends of the central part
was crushed a little. The side continuous girders must have been
thrust in the longitudinal direction during ground movement.
The pylon had flexural and torsional cracks with spall off of
cover concrete above the PC girder. One stay cable was broken.
Diagnosis:
Looking at the overall damage, the girder of the central part
might have rotated horizontally at the pylon and lead to the breakage
of PC tendons which connected the central part to the side girders.
The ends of side girders moved laterally from the original position.
The girders were not so seriously damaged. The pylon was also
slightly damaged and could be retrofitted easily by wrapping with
steel plate or continuous fiber sheets.
[Comment from Prof. J.C. Chern]
The manager of T. Y. Lin Co. mentioned that the construction company
just took away the tower crane, which located at the empty hole
near the pylon. This is the major reason why it vibrated so much
during the great earthquake.
Suggestions:
Dynamic analysis is strongly recommended to examine structural
behavior during the earthquake movement. It can reveal what had
happened during the earthquake and tell us what we should do to
improve the design of this type of structure.
